Subbasin Planning

If you cannot download a file, please contact the Library (oftl ‘@’ critfc.org or 503-238-0667).

Columbia Basin Fish and Wildlife Authority. 1990. Integrated system plan for salmon and steelhead recovery in the Columbia River Basin.(Review draft). Columbia Basin System Planning.

Mountain Columbia Province (Draft 2002-2004 Work Plan)

Inter-Mountain Province: Spokane River downstream of Lake Couer d’Alene; Columbia River and all tributaries between and including Chief Joseph Dam and the U.S./Canada border (Draft Work Plan 2001-2003)

Columbia Plateau North Province: Columbia River and all tributaries upstream of The Dalles Dam up to and including Wanapum Dam on the north and west bank and Crab Creek

Columbia Plateau South Province: Columbia River and all tributaries on the south bank upstream of The Dalles Dam up to the confluence with the Snake River; Snake River and all tributaries from Lewiston, Idaho, to the confluence with the Columbia River

Blue Mountain Province: Snake River and all tributaries from Lewiston to Hells Canyon Dam

Mountain Snake Province

Columbia Cascade Province: Columbia River and all tributaries downstream from, but not including, Chief Joseph Dam to Wanapum Dam

Columbia Gorge Province: Columbia River and all tributaries between and including Bonneville and The Dalles Dam  (Draft Work Plan 2001-2003)

Lower Columbia Province: Columbia River and all tributaries above the estuary and downstream of, but not including, Bonneville Dam

Columbia River Estuary Province: Columbia River and all tributaries downstream of the Cowlitz River confluence

Middle Snake Province: Snake River and all tributaries from Hells Canyon Dam to Shoshone Falls (Draft 2003-2005 Work Plan)

Upper Snake Province: Snake River and all tributaries from Shoshone Falls to headwaters, all closed basins within the Columbia Basin east of Shoshone Falls

Mainstem and Systemwide